Good inspectors are hard to find, and too much of their day goes to paperwork.
Whether it’s a periodic NEN 3140 inspection, a round of medium-voltage rooms or a client’s own checklist, the same inspection comes back hundreds of times a year. Each one ends with a report somebody has to write, and more of them are carried out by freelancers and contractors whose work you still have to stand behind.
SITE IMAGE
When the inspector leaves, the report is ready to sign.

01 / REPORTING
Every inspection ends with an evening of typing.
Notes on paper, photos on a phone, readings on a meter. Turning all of it into a report takes hours your inspectors could spend inspecting.
02 / RETURN VISITS
One missing reading means another trip.
A photo that’s too dark, a measurement nobody wrote down. You find out back at the desk, and someone has to drive out again.
03 / TRUST
You can’t see who checked what.
Contractors and freelancers carry out more of your inspections. When their report comes in, you have to take their word that every check was actually done.
Without Perry
2 weeks to a signed report
Notes, photos and readings get typed up at the office, checked by a colleague and sent back because a photo is missing. The client waits, and so does your invoice.
With Perry
Signed on site.
Perry fills in part of the inspection from the photos, checks every photo is usable, and drafts the report while the inspector works. They read it through, confirm and sign before they leave the site.
01
Just talk and take photos.
Your inspector says what they see and photographs what they check. Perry reads the photos and fills in part of the inspection itself, like counting the fuse-switches in a distribution board. If a photo is too blurry or a reading doesn’t match the inspection plan, the inspector knows on the spot, not back at the office. Perry drafts the report as they go, and they confirm and sign. It works offline too, in the plant room where there’s no signal.
02
Anyone can inspect to your standard.
Send contractors and freelancers a link. They don’t need an account or a login, and they work in their own language. Every step is logged with GPS, timestamp and photo, so you know the inspection really happened. All of it is stored in the EU, GDPR-proof and compliant with the EU AI Act.
03
Your inspection, built from your own document.
Upload the inspection plan or checklist you already use, whether it’s NEN 3140, SCIOS or a client’s own format, and it’s running this week. When a standard changes, you update the inspection in minutes and every inspector works with the new version.


“This saves me 2 hours per report. I can just speak and it will be there.”
Inspector, Van Vulpen


